Preliminary submissions
Preliminary submissions to the Central Goldfields Shire Council electoral structure review closed on 1 March 2023.
You can access and download all submissions below.
Submitter name | Locality | Date received |
---|---|---|
Doran, Anne (PDF, 1.3 MB) | Eddington | 17 February 2023 |
Central Goldfields Shire Council (PDF, 907.3 KB) | Maryborough | 01 March 2023 |
Moyle, John (ZIP, 37.0 KB) | Maryborough | 27 February 2023 |
To open KMZ format files, you will need geographic information systems (GIS) software such as Google Earth.
The views expressed in submissions are those of the authors and do not reflect the views of the electoral representation advisory panel or the VEC.